2012年,完成缅甸密松水电站(3×400MW)主体施工、服务招标工作。
In 2012, completed bidding for main works construction and service of 3×400MW Myitsone Hydropower Station.

2012年,完成中电国际山西神头 “上大压小”2×600MW超临界空冷机组工程设备招标、设备监造和进口设备采购代理工作。
In 2012, completed equipment bidding, manufacturing supervision and import for Shanxi Shentou 2×600MW super critical units under the Program of Replacing Small Units with Large Ones.

2012年,完成内蒙古霍煤鸿骏铝电项目设备招标工作。
In 2012, completed equipment bidding for aluminum and electricity project of Huomeihongjun Company.

2012年,完成黄河公司、贵州金元、江西公司等水电项目超过30个批次招标工作。
In 2012, completed more than 30 batches of bidding for hydropower projects of Huanghe Hydropower Development Company, Guizhou Jinyuan Group and Jiangxi Branch etc.

2012年,开展海阳核电项目四台机组95个设备包的采购工作,执行采购合同116个,完成海阳、彭泽两个核电项目23个设备包的设备监造工作。
In 2012, started procurement of 95 equipment packages for 4 units of Haiyang NPP and excuted 116 procurement contracts; completed manufacturing supervision of 23 equipment packages for Shandong Haiyang NPP and Jiangxi Pengze NPP.

2012年,完成阚山火电、拉西瓦水电、通辽泰合风电等六个项目的后评价工作。
In 2012, completed post-evaluation for six projects such as Kanshan Thermal Power, Laxiwa Hydropower and Tongliao Taihe Wind Power.

2012年,全年完成21个风电、水电类型CDM项目的联合国注册工作,实现减排量211.7万吨。
In 2012, completed UN registration for 21 CDM projects covering wind power and hydropower, realizing emission reduction of 2.12 million tons.

2012年,全年完成超过800家企业产品认证工作,累计发证7400张。
In 2012, completed accreditation for over 800 companies and issued 7400 certificates.

2012年,全年完成火电、露天煤矿、多晶硅等项目物资国际招标额近7亿元人民币。
In 2012, completed international competitive bidding for materials procured for thermal power, open-pit coal mine and polycrystalline silicon projects worth around RMB 700 million.

2012-2013年,开展西安/西宁光伏(1000MW/400MW)、西宁多晶硅项目(1250吨/年)、蒙东能源露天煤矿项目(1500万吨/年)、新疆煤制气(60亿Nm3/a)等30个项目的进口代理工作。
During 2012-2013, implemented equipment or technology import for 30 projects such as Xi'an/Xining PV (1000MW/400MW), Xining polycrystalline silicon(1250t/y), Mengdong Energy open-pit coal mine(15m t/y) and Xinjiang Syngas (6billion Nm3/a).

2012年,完成华润电力湖北蒲圻电厂二期2×1000MW 超超临界燃煤发电机组工程项目招标代理及四大管道管材、管件和工厂化配管配送。
In 2012, completed bidding for Hubei Puqi Power Plant Phase II 2×1000MW USC units under China Resources Power Holdings Co., Ltd. and delivery of piping, pipe fittings and fabricated pipes.

2012年,完成江苏射阳港发电厂扩建工程2×660MW机组四大管道管材、管件及工厂化配管配送。
In 2012, completed delivery of piping, pipe fittings and fabricated pipes for 2×660MW Jiangsu Sheyanggang Power Plant brown field project.

2012年,完成华润新能源公司22个风电项目(110万千瓦)的招标代理。
In 2012, completed bidding for 22 wind power projects with total installed capacity over 1100MW.

2012年,完成广东粤电惠来电厂一期3、4号2×1000MW超超临界燃煤机组主机及辅机设备监造。
In 2012, completed main machine and auxiliary equipment manufacturing supervision for 2×1000MW units 3&4 of phase I of Guangdong Yuedianhuilai Power Plant.

2012年,完成河北建投宣化热电2×300MW、华润(涟源)2×300MW机组主机及辅机设备监造。
In 2012, completed equipment manufacturing supervision for main and auxiliary machine of 2×300MW Xuanhua Co-generation Power Plant under Hebei Construction & Investment Group Co., Ltd. and of 2×300MW Lianyuan Power Plant under China Resources Power Holding Co., Ltd.

2012年,完成印尼楠棒2×100MW燃煤火电厂主机及辅机设备监造。
In 2012, completed equipment manufacturing supervision for main and auxiliary machine of 2×100MW Indonesia Nanbang Thermal Power Plant.

2012年,完成辽宁北票台吉营、赤峰亿合公二期、新疆能源玛依塔斯、内蒙古乌拉特中旗等7个风电项目(350MW)主辅机设备监造。
In 2012, completed equipment manufacturing supervision for main and auxiliary machine of 7 wind power projects (350MW) such as Liaoning Beipiao Taijiying, Chifeng Yihegong Phase II, Xinjiang Energy Mayitas and Inner Mongolia Wulatezhong prefecture.

2012年,完成9个输变电项目,包括国网特高压锦屏-苏南±800KV直流、Ⅱ期工程铁塔、导线设备监造。 
In 2012, completed manufacturing supervision of transmission towers and overhead lines for 9 power distribution and transmission projects including State Grid ultra high voltage Jinping-Sunan ±800KV DC Phase II.

2012年,完成黄河积石峡、四川毛尔盖、国电大渡河深溪沟等3个水电站2100MW主机及主要辅机设备监造。
In 2012, completed equipment manufacturing supervision of main machine and major auxiliary machine for Huanghe Jishixia, Sichuan Maoergai and Guodian Daduhe hydropower stations (2100MW).

2012~2013年,完成西宁光伏等项目设备进口减免税。
During 2012-2013, completed duty exemption for imported equipment for projects including Xining PV project.